Concrete takeoff
Raft slab foundation to NZS 3604 with engineer-designed edge thickenings.
Inspect real output formatting across US CSI MasterFormat, UK RICS NRM2, Australia ANZSMM 2018, and New Zealand NZS 3604 trade schedules.
Each sample shows the deliverables you receive on a real job: an itemized Excel bill of quantities with material, labor, and equipment lines, color-coded PDF takeoff markups, and a summary by CSI division or local measurement standard. Samples are available as XLS, PDF, and CSV downloads for commercial and residential projects.
Structured CSI Division CSV takeoff with unit quantities, waste allowances, and vendor pricing columns ready for Excel or bid-leveling import.
Full NZS 3604 & AS/NZS takeoff schedules exported for Auckland, Wellington, and Canterbury builders.
Raft slab foundation to NZS 3604 with engineer-designed edge thickenings.
Timber framing to NZS 3604, SG8 H1.2 unless noted.
Long-run 0.40 BMT corrugate on purlins, 25° gable/hip roof.
Hydraulics to AS/NZS 3500; separate above-ground and drainage scopes.
Domestic installation to AS/NZS 3000. Final design by the electrician.
Wastewater and stormwater to E1 and G13, gravity to council connections.
Plasterboard linings, Level 4 finish; H1 insulation to Climate Zone 2.
Trade-by-trade quantity summary used to build a priced estimate. Rates are added per client.
Raw spreadsheet quantities formatted for direct subcontractor rate entry.
Pre-formatted metric Australian bills of quantities across 14 building trades.
| Ref / NRM2 | Description | Qty | Unit | Measurement Note |
|---|---|---|---|---|
| RE-01 (04 Alterations) | Break out existing rear cavity loadbearing wall (2400mm opening); temporary Acrow/Strongboy needling & cart-away skips | 1.00 | item | Separated from new-build brickwork |
| RE-02 (05 Excavation) | Trench excavation for 600mm wide strip footings to 1.25m depth; includes 50mm compressible clay-heave board against existing drains | 16.50 | m3 | Clay soil bulking factor noted |
| RE-03 (14 Masonry) | Facing brickwork outer leaf (F2 durability, stretcher bond) + 100mm PIR full-fill insulation + 100mm dense block inner leaf | 54.20 | m2 | Net of window & bifold openings |
| RE-04 (15 Steelwork) | Fabricated S355 steel goal-post box frame (203x203x46 UC columns + 254x146x37 UB lintel beams) with bolted splice plates & primer | 1.42 | t | Matched to structural engineer GA |
| RE-05 (17 Roofing) | Warm flat roof assembly: C24 joists @ 400mm cts, 18mm OSB3 deck, VCL, 150mm PIR insulation & 1.5mm EPDM single-ply membrane | 36.80 | m2 | Excludes rooflight opening |
Upload your PDF blueprints, CAD files, or tender pack and receive a flat-fee quote within 15 minutes.