Metal Framing Estimating Services — USA (Div 05)
Fee range: $90 – $680 · Turnaround: 24–48 Hours. Ready for subcontractor vendor RFQs or GC lump-sum bid summaries.
Quantities & Takeoff Scope Included
- Complete Metal Framing Estimating material, fixture, assembly, and accessory takeoff from PDF/CAD/BIM plans
- K/LH/DLH open-web steel joists, bridging rows, and 1.5" Type B / 2"–3" composite metal decking
- Connection material factor (clip angles, shear tabs, moment welds, A325/A490 TC bolts, Nelson studs)
- Division 05 50 00 stairs, pan treads, guardrails, bollards, ladders, lintels & ornamental metals
Bid Risks & Omissions Prevented
- Missing 10–14% connection plate/bolt weight allowance on conceptual structural drawings
- Hot-dip galvanizing vs high-performance SSPC-SP6 zinc-rich shop coat specifications
- AISC certified erector requirements, crane mat pads, and ultrasonic weld inspection
Frequently Asked Questions
What does our US metal framing estimating takeoff measure?
Measured items cover Complete Metal Framing Estimating material, fixture, assembly, and accessory takeoff from PDF/CAD/BIM plans; K/LH/DLH open-web steel joists, bridging rows, and 1.5" Type B / 2"–3" composite metal decking; Connection material factor (clip angles, shear tabs, moment welds, A325/A490 TC bolts, Nelson studs)—plus marked-up PDF plan layers and explicit waste factors.
Ready to Price Your Next Construction Bid with Precision?
Upload your PDF blueprints, CAD files, or tender pack and receive a flat-fee quote within 15 minutes.