Div 21, 22, 23, 26–28 · Integrated Mechanical, Electrical, Plumbing & Fire Protection

MEP Estimating Services — United States (Div 21, 22, 23, 26–28)

Typical fee: $150 – $1,150 · Turnaround: 24–48 Hours. Built inside Trimble Accubid, FastPIPE, FastDUCT, Navisworks Manage, Bluebeam Revu.

Sample US MEP Combined Line Items

Illustrative MEP Combined BOQ Lines
CSI CodeDescriptionUnitSample QtyBase Unit Cost ($)Scope Notes
21 13 13 Wet-Pipe Automatic Fire Sprinkler System (Light/Ordinary Hazard)SF45,000$4.35Schedule 10/40 mains, quick-response heads, hydraulic calc
22 00 00 Complete Commercial Domestic, Sanitary & Storm Plumbing PackageSF45,000$9.8Risers, core restroom groups, water heating plant
23 00 00 Packaged VAV HVAC + Hydronic Reheat + DDC BAS ControlsSF45,000$22.4RTUs, SMACNA ductwork, VAVs, certified TAB
26 00 00 480V Distribution, LED Lighting, Controls & Addressable Fire AlarmSF45,000$19.6Gear, feeders, branch power, Title 24/IECC lighting

Specialized MEP Combined Sub-Trades (10)

Frequently Asked Questions

How are US mep combined quantities structured?

Every mep combined package aligns strictly with Integrated Mechanical, Electrical, Plumbing & Fire Protection (Div 21, 22, 23, 26–28) in Imperial units, separating material supply, fabrication, and crew hours.

Can pricing reflect union or Davis-Bacon prevailing wages?

Yes. Select union/prevailing wage calibration on any quote to mirror state or county wage determinations.

United States · MEP Combined

Ready to Price Your Next Construction Bid with Precision?

Upload your PDF blueprints, CAD files, or tender pack and receive a flat-fee quote within 15 minutes.

View Sample BOQs

Request a Flat-Fee Takeoff Quote

Firm quote in 15 minutes · 24–48 hour delivery