Div 02 · Selective/Structural Demolition, Abatement & Xactimate Restoration

Demolition & Restoration Estimating — United States (Div 02)

Typical fee: $85 – $580 · Turnaround: 24–48 Hours. Built inside Xactimate, PlanSwift, Bluebeam Revu, RSMeans Remediation.

Sample US Demolition & Restoration Line Items

Illustrative Demolition & Restoration BOQ Lines
CSI CodeDescriptionUnitSample QtyBase Unit Cost ($)Scope Notes
02 41 19 Selective Interior Tenant Gut Demolition (Partitions, ACT, Flooring & Carting)SF24,000$4.85Includes elevator protection, night carting & 30-yd roll-off tipping fees
02 82 13 Friable Asbestos Pipe/VAT Abatement w/ Full Negative-Air HEPA ContainmentSF6,200$14.2Includes 6-mil double poly, decon unit, air clearance & hazmat disposal
02 41 16 Complete 3-Story Structural Steel/Masonry Building Wrecking & Slab RemovalCF420,000$0.62Includes high-reach shear, misting cannon & net scrap credit

Specialized Demolition & Restoration Sub-Trades (10)

Frequently Asked Questions

How are US demolition & restoration quantities structured?

Every demolition & restoration package aligns strictly with Selective/Structural Demolition, Abatement & Xactimate Restoration (Div 02) in Imperial units, separating material supply, fabrication, and crew hours.

Can pricing reflect union or Davis-Bacon prevailing wages?

Yes. Select union/prevailing wage calibration on any quote to mirror state or county wage determinations.

United States · Demolition & Restoration

Ready to Price Your Next Construction Bid with Precision?

Upload your PDF blueprints, CAD files, or tender pack and receive a flat-fee quote within 15 minutes.

View Sample BOQs

Request a Flat-Fee Takeoff Quote

Firm quote in 15 minutes · 24–48 hour delivery