Demolition & Restoration Estimating — United States (Div 02)
Typical fee: $85 – $580 · Turnaround: 24–48 Hours. Built inside Xactimate, PlanSwift, Bluebeam Revu, RSMeans Remediation.
Sample US Demolition & Restoration Line Items
| CSI Code | Description | Unit | Sample Qty | Base Unit Cost ($) | Scope Notes |
|---|---|---|---|---|---|
| 02 41 19 | Selective Interior Tenant Gut Demolition (Partitions, ACT, Flooring & Carting) | SF | 24,000 | $4.85 | Includes elevator protection, night carting & 30-yd roll-off tipping fees |
| 02 82 13 | Friable Asbestos Pipe/VAT Abatement w/ Full Negative-Air HEPA Containment | SF | 6,200 | $14.2 | Includes 6-mil double poly, decon unit, air clearance & hazmat disposal |
| 02 41 16 | Complete 3-Story Structural Steel/Masonry Building Wrecking & Slab Removal | CF | 420,000 | $0.62 | Includes high-reach shear, misting cannon & net scrap credit |
Specialized Demolition & Restoration Sub-Trades (10)
Frequently Asked Questions
How are US demolition & restoration quantities structured?
Every demolition & restoration package aligns strictly with Selective/Structural Demolition, Abatement & Xactimate Restoration (Div 02) in Imperial units, separating material supply, fabrication, and crew hours.
Can pricing reflect union or Davis-Bacon prevailing wages?
Yes. Select union/prevailing wage calibration on any quote to mirror state or county wage determinations.
Ready to Price Your Next Construction Bid with Precision?
Upload your PDF blueprints, CAD files, or tender pack and receive a flat-fee quote within 15 minutes.