United Kingdom · NRM2 Section 5 (Foundations, Basements & Trenches)
Excavation Estimating — United Kingdom (NRM2 Section 5 (Foundations, Basements & Trenches))
Units: · Turnaround: . Ready for JCT, NEC, and UK domestic tenders.
Measurement Rules & UK Tender Scope
- Groups dig depths consistently (up to 1.0m, 1.0–2.0m, 2.0–4.0m, and beyond) as standard NRM2 practice.
- Includes working space clearances around external waterproofing membranes and trench sheet line setups.
Quality & Scope Verification Checklist
Frequently Asked Questions
How are UK excavation bills formatted?
Measured under NRM2 Section 5 (Foundations, Basements & Trenches) rules in Metric units (), separating net builders’ quantities from prelims, wastage allowances, and tender clarifications.
United Kingdom · RICS NRM2
Ready to Price Your Next Construction Bid with Precision?
Upload your PDF blueprints, CAD files, or tender pack and receive a flat-fee quote within 15 minutes.