Div 08 · Turnaround: 24–48 Hours

Window Estimating

Precision window estimating calibrated for general contractors, trade subcontractors, and developers—built straight from scaled blueprints in 24–48 hours.

See Sample Outputs

Scope & Measured Quantities

Each window estimating commission separates material quantities, wastage factors, equipment requirements, and crew labor hours so vendors and field leads can review figures effortlessly.

  • Complete Window Estimating material, fixture, assembly, and accessory takeoff from PDF/CAD/BIM plans
  • Complete BHMA finish & electrified hardware sets (mortise locks, closers, panic devices, power supplies)
  • 2"x4-1/2" thermally broken aluminum storefront, 2-1/2"x6" curtain wall & 1" solar-control Low-E IGUs
  • Insulated sectional dock doors, rolling steel fire doors, automatic ADA operators & glass railings

Common Bid Risks Eliminated

  • Electrified hardware coordination gaps (electric strikes, EPT hinges, low-energy ADA operators)
  • Tempered/laminated safety glass code upgrades within 24" of doors and <18" from finished floor
  • Structural wind-load steel tube reinforcing inside tall curtain-wall mullions

Frequently Asked Questions

What deliverables are included with window estimating?

Every completed window estimating order includes a line-by-line Excel takeoff workbook, color-coded PDF plan markups tracing measured items, an explicit inclusions/exclusions log, and optional regional pricing.

Can you deliver schedules in metric or imperial units depending on project country?

Yes. US projects default to Imperial CSI units (SF, LF, CY, TON) while UK, Canadian, Australian, and New Zealand orders deliver cleanly in metric BOQ formats.

USA, UK, Canada, Australia & New Zealand

Ready to Price Your Next Construction Bid with Precision?

Upload your PDF blueprints, CAD files, or tender pack and receive a flat-fee quote within 15 minutes.

View Sample BOQs

Request a Flat-Fee Takeoff Quote

Firm quote in 15 minutes · 24–48 hour delivery