Div 06 · Turnaround: 24–48 Hours

Casework Estimating

Precision casework estimating calibrated for general contractors, trade subcontractors, and developers—built straight from scaled blueprints in 24–48 hours.

See Sample Outputs

Scope & Measured Quantities

Each casework estimating commission separates material quantities, wastage factors, equipment requirements, and crew labor hours so vendors and field leads can review figures effortlessly.

  • Complete Casework Estimating material, fixture, assembly, and accessory takeoff from PDF/CAD/BIM plans
  • TJI I-joists, Glulam/LVL beams, prefabricated wood roof/floor trusses, and subflooring/sheathing
  • Simpson hurricane clips, hold-downs, shear wall nailing schedules & fire-retardant treated blocking
  • AWI plastic laminate & hardwood veneer casework, solid-surface tops, running trim, and wood decking

Common Bid Risks Eliminated

  • Missed multi-story continuous tiedown rod systems (ATS) in high-wind or seismic zones
  • Fire-retardant treated (FRT) plywood backing inside telecom/electrical rooms and roof parapets
  • AWI Premium vs Custom grade finish carpentry veneer matching and shop drawing engineering

Frequently Asked Questions

What deliverables are included with casework estimating?

Every completed casework estimating order includes a line-by-line Excel takeoff workbook, color-coded PDF plan markups tracing measured items, an explicit inclusions/exclusions log, and optional regional pricing.

Can you deliver schedules in metric or imperial units depending on project country?

Yes. US projects default to Imperial CSI units (SF, LF, CY, TON) while UK, Canadian, Australian, and New Zealand orders deliver cleanly in metric BOQ formats.

USA, UK, Canada, Australia & New Zealand

Ready to Price Your Next Construction Bid with Precision?

Upload your PDF blueprints, CAD files, or tender pack and receive a flat-fee quote within 15 minutes.

View Sample BOQs

Request a Flat-Fee Takeoff Quote

Firm quote in 15 minutes · 24–48 hour delivery