N.01 Full Construction Estimating
Complete Division 01–48 cost analysis including material, labor, equipment, and site preliminaries.
Fast 24–48 hour turnaround, competitive flat-fee pricing from $80, and detailed quantity takeoffs for all trades.
Professional Estimating LLC prepares construction cost estimates and material takeoffs for general contractors, subcontractors, builders, and developers in the USA, UK, Canada, Australia, and New Zealand. Since 2000 we have completed 5,499+ estimates, with 24–48 hour turnaround, flat fees from $80, and a two-stage senior review targeting 99.2%+ accuracy.
At Professional Estimating LLC, we specialize in delivering detailed, audit-ready construction estimates and material takeoffs for general contractors, subcontractors, builders, and developers across the USA, UK, Canada, Australia, and New Zealand.
We save up to 50% in in-house estimating overhead while delivering itemized Excel BOQs and color-coded PDF takeoff markups within 24 to 48 hours.
N.01 Complete Division 01–48 cost analysis including material, labor, equipment, and site preliminaries.
N.02 Line-by-line quantity takeoffs and Excel Bills of Materials with waste allowances for fast procurement.
N.03 Tailored builders’ takeoffs for custom single-family homes, multi-unit housing, additions, and remodels.
N.04 Commercial tenant improvement, shell & core, office, healthcare, and industrial CSI bid packages.
N.05 Specialist estimating across electrical, mechanical, HVAC, plumbing, concrete, framing, roofing & finishes.
N.06 Subcontractor quote leveling, addendum updates, value engineering options, and bid-day deadline support.
Reliable 24–48 hour delivery for residential and commercial takeoffs so you never miss a tender closing.
Upfront lump-sum proposals starting at $80 USD with zero surprise surcharges or hidden fees.
Electrical, HVAC, plumbing, concrete, masonry, steel, carpentry, roofing, finishes & sitework.
Senior QA review and localized labor rates keep your winning bid protected against margin erosion.
Upload project drawings in PDF, DWG, or BIM/Revit format along with specifications and bid dates.
Our trade estimators carefully review every drawing sheet, addendum, and local code requirement.
Receive a clear flat-fee quote within 15 minutes with guaranteed scope deliverables and turnaround.
Get your itemized Excel BOQ with material counts, man-hour rates, and color-coded PDF markups.
Prepared by engineers and quantity surveyors experienced in active field costing.
Two-stage senior quality checks before every takeoff leaves our estimating desk.
Standard 24–48 hour turnaround keeps your team ahead on multi-bid tender weeks.
Structural, architectural, civil sitework, concrete, lumber, finishes, and full MEP.
No recurring software overhead—submit PDFs or CAD links and receive ready Excel tabs.
Over 5,499 completed construction estimates supporting winning contractor bids since 2000.
Open your dedicated country desk for localized measurement rules, local wage pricing, and ZIP or postcode indices.
CSI MasterFormat 50 Divisions & RSMeans / NECA Labor Units
Units: Imperial (SF, LF, CY, TON)
RICS NRM2 Bills of Quantities, JCT/NEC Tenders & Part L / BSA
Units: Metric (m2, m3, lm, kg, t)
CSI MasterFormat Canada, NBCC, CEC & CIQS Elemental Takeoffs
Units: Metric & Hybrid Trade Units
ANZSMM 2018 BOQ, NCC 2022–2025 7-Star & QBCC/VBA Compliance
Units: Metric (m2, m3, lm, kg, t)
NZS 3604, Clause H1 Energy Efficiency & AS/NZS Trade Schedules
Units: Metric (m2, m3, lm, no)
Send us your project plans today and get an accurate, transparent construction estimate in 24 to 48 hours.
Upload scaled architectural, structural, civil, and MEP drawings in PDF, DWG, DXF, or Revit/IFC format, together with specifications and any addendum notices. We accept Dropbox, Google Drive, PlanGrid, and Procore share links.
Single-trade takeoffs and focused residential packages turn around within 24 to 48 hours. Multi-trade commercial or institutional bills of quantities follow an agreed bid-day deadline, with firm fee pricing issued within 15 minutes of plan upload.
Yes. Dedicated estimating standards govern each region: CSI MasterFormat and RSMeans/NECA ZIP rates for the United States ($), RICS NRM2 and JCT/NEC schedules for the UK (£), NBCC/CIQS labour factors for Canada (CA$), ANZSMM 2018 and NCC 2025 for Australia (A$), and NZS 3604 / Clause H1 for New Zealand (NZ$).
Every standalone bid receives a transparent lump-sum quote before work starts (starting from $80 USD / £75 / CA$75 / A$130 / NZ$125 for single trades), and frequent bidders can switch to discounted monthly dedicated estimator capacity.
“Excellent service all round—fast, informative, and thoroughly detailed. Every material takeoff and man-hour schedule helped our bidding team stay ahead of tight commercial deadlines.”
Clean Excel breakdown with Division 01–48 codes, quantity extensions, waste allowances, and crew labor rates.
| CSI / Section | Quantity | Unit Rate | Line Total | Measurement Scope |
|---|---|---|---|---|
| 03 30 00 · Cast-in-Place Slab | 485 CY | $238 / CY | $115,430 | 4,000 PSI, #4/#5 rebar, vapor barrier & pump |
| 05 12 00 · Structural Steel | 64 TON | $4,180 / TON | $267,520 | Wide-flange A992 erected with bolted splices |
| 07 54 00 · TPO Roof Assembly | 18,400 SF | $8.65 / SF | $159,160 | 60-mil membrane, tapered R-30 polyiso & flashings |
| 26 24 00 · Switchboards & Feeders | 1,200A Gear | $42,800 LS | $42,800 | Main 1200A MDP, surge arrestor & conduit risers |
Certified Professional Estimator (CPE), ASPE, CSI MasterFormat & RICS NRM2 Specialist
Last Verified:
Share your drawings link or call anytime on 908 488 9245 — submissions go to info@professionalestimatings.com & jay@professionalestimatings.com.